Hello,
I am working on starting a simulation and I have a CAV unit served by a chiller. I noticed there is not a template that fits this specific purpose. Is it better in your opinions to start with a CHW VAV system then just change the equipment after expanding the .idf or do you usually start with a CAV system and then make a chilled water coil after expanding? I am just curious to see which methodology is generally faster. Thank you.
John Grando
__._,_.___
Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx
The primary EnergyPlus web site is found at:
http://www.energyplus.gov
The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/
Attachments are currently allowed but be mindful that not everyone has a high speed connection. Limit attachments to small files.
EnergyPlus Documentation is searchable. Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.
Your email settings: Individual Email|Traditional
Change settings via the Web (Yahoo! ID required)
Change settings via email: Switch delivery to Daily Digest | Switch to Fully Featured
Visit Your Group | Yahoo! Groups Terms of Use | Unsubscribe
__,_._,___