[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[EnergyPlus_Support] LEED Unmet Hours
Hello All,
I am aware that LEED wants the difference between the number unmet hours in baseline and proposed design to not exceed 50. But, does that mean, difference between (heating + cooling) unmet load hours of proposed and baseline does not exceed 50 or they don't exceed 50 separately for cooling and heating.
Any clarification would be much appreciated.
Thank you.
Regards,
Vinay
__._,_.___
Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx
The primary EnergyPlus web site is found at:
http://www.energyplus.gov
The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/
Attachments are currently allowed but be mindful that not everyone has a high speed connection. Limit attachments to small files.
EnergyPlus Documentation is searchable. Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.
__,_._,___