[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: [EnergyPlus_Support] weather file





Thanks, Linda. If I keep the hour values from Jan 1 to Jun 1 in the weather file and delete other hours, is this feasible?  I want to do this because I plan to use the BCVTB to control EPlus for specified days. I am still thinking about this.

Thanks,
Jia  

On Thu, Dec 23, 2010 at 9:58 PM, Linda Lawrie <linda@xxxxxxxxxxxxxx> wrote:
 

No, why would you want to do that?

You could make multiple run periods for each period you want to run, however.



At 06:29 PM 12/23/2010, Jia Hu wrote:


Hello:

I have a question here. If I convert E+ weather file to csv and then delete several days in each month (that is, delete several rows in the csv file) to run simulations, how can I specify the RunPeriod object in the idf file? Does EPlus allow to use weather files with non-continuous days or hours?

Thank you,

JH






__._,_.___


Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx

The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.




Your email settings: Individual Email|Traditional
Change settings via the Web (Yahoo! ID required)
Change settings via email: Switch delivery to Daily Digest | Switch to Fully Featured
Visit Your Group | Yahoo! Groups Terms of Use | Unsubscribe

__,_._,___