All:
Can E+ model primary/secondary loops? Can it model the change in pump power according to varying pump load? What about the resultant total dynamic head after the design is complete and all design restrictions have been taken into account? And what about DCV (Demand Control Ventilation? Can it adjust the building load as it relates to reduced ventilation loads? Sorry for the 20 questions. I'm just new to E+ and this users group.
Regards,
Mike Porter