[EnergyPlus_Support] How to let chillers operate on shedule





Hi,all

There are several chillers and pumps in the plant. It is a constant primary chilled water system. I want to simulate the chillers and pumps operate on a time schedule. It means, for instance, at 8:00 chiller1, chiller2, pump1 and pump2 operate, at 10:00 chiller 1~4 and pump 1~4 operate. The chillers and pumps operate at the time schedule regardless of the cooling load operation scheme.

Thank you very much!

 
2012-04-08

hyp


__._,_.___


Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx

The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.




Your email settings: Individual Email|Traditional
Change settings via the Web (Yahoo! ID required)
Change settings via email: Switch delivery to Daily Digest | Switch to Fully Featured
Visit Your Group | Yahoo! Groups Terms of Use | Unsubscribe

__,_._,___