Hi,I'm modelling an office building for 90.1 Apendix G. Im a bit stuck with how much detail I have to model since the building is quite big. Do I need to zone the open plan office by dividing it into zones for each VAV box? Or can I just make one core zone, 4 perimeter zones (one for each orientation), plus one zone for combining unheated spaces (elevators, stairs, etc)?ThanksRic.
__._,_.___
Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx
The primary EnergyPlus web site is found at:
http://www.energyplus.gov
The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/
Attachments are currently allowed but be mindful that not everyone has a high speed connection. Limit attachments to small files.
EnergyPlus Documentation is searchable. Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.
Your email settings: Individual Email|Traditional
Change settings via the Web (Yahoo! ID required)
Change settings via email: Switch delivery to Daily Digest | Switch to Fully Featured
Visit Your Group | Yahoo! Groups Terms of Use | Unsubscribe
__,_._,___