[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

RE: [EnergyPlus_Support] occupation





A simple answer is yes.
 
In detail, you need to check all the schdules and fields in the People object.  Occupancy, activiti level, closthing, fresh air per person, etc.
 
Set point not met is a general warning which may involved other factors.
 
Comfort level not met is more specific to people, moisture and temperature.

 Dr. Li  

 

To: EnergyPlus_Support@xxxxxxxxxxxxxxx
From: direzionecontraria@xxxxxxxx
Date: Tue, 24 Jul 2012 16:09:09 +0000
Subject: [EnergyPlus_Support] occupation

 
The reports AnnualBuildingUtilityPerformanceSummary and SystemSummary present data concerning "Time Setpoint Not Met" during "Occupied Heating [hr]".
In order to calculate those data, does EnergyPlus consider a zone as "occupied" or as "unoccupied" on the basis of the object People?
Are there other objects which influence the occupation?
Best Regards
Francesco Passerini




__._,_.___


Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx

The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.




Your email settings: Individual Email|Traditional
Change settings via the Web (Yahoo! ID required)
Change settings via email: Switch delivery to Daily Digest | Switch to Fully Featured
Visit Your Group | Yahoo! Groups Terms of Use | Unsubscribe

__,_._,___