Hi there,
I'm trying to model an office tower that is conditioned by active chilled beams. I am having an issue with the sequencing of systems on the Chilled Water Loop Demand Side. The intent is for the chilled water to serve the Air Handling Units first. The water on the secondary return mixes together after the AHUs, then serves the chilled beams at a higher temperature before returning to the chillers.
It appears this loop architecture is not possible within energy plus.
Do you have a recommended method for modelling chilled beams, given they cannot be modeled in parallel or series on the secondary demand loop?
Any assistance or work-arounds would be greatly appreciated!
Thanks,
Alex
__._,_.___
Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx
The primary EnergyPlus web site is found at:
http://www.energyplus.gov
The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/
Attachments are currently allowed but be mindful that not everyone has a high speed connection. Limit attachments to small files.
EnergyPlus Documentation is searchable. Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.
Your email settings: Individual Email|Traditional
Change settings via the Web (Yahoo! ID required)
Change settings via email: Switch delivery to Daily Digest | Switch to Fully Featured
Visit Your Group | Yahoo! Groups Terms of Use | Unsubscribe
__,_._,___