[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: [EnergyPlus_Support] EMS Trend variable array





Perfect thanks. Sorry, I realise the difference of variable to trend and trend variable array was not in my example...I'm happy you could understand me so well dispite. 
Again, perfect answer, thanks.
Jean

Sent from my iPhone (excuse the brevity)
Mit freundlichen Grü�en

i. A.
Jean Marais
B.Eng (Mech)
LEED Accredited Professional
Building Energy Modeling with DesignBuilder and EnergyPlus

b.i.g. bechtold
INGENIEURGESELLSCHAFT MBH
KeithstraÃ?e 6
10787 Berlin
Tel.   +49 30 6706662-23
Fax  +49 30 6706662-18
Firmensitz: Berlin, Registergericht: Amtsgericht Charlottenburg, HRB 112242 B
Geschäftsführer: Bernd Bechtold, Tino Laupitz, Carsten Teichmann

"The LEED® (Leadership in Energy and Environmental Design) Green Building
Rating System is the nationally accepted benchmark for the design, construction,
and operation of high performance green buildings."
Other LEED descriptive copy may be found on the USGBC Web site: http://www.usgbc.org/leed

Official Reseller for DesignBuilder in Germany and Austria
 


On 17.06.2013, at 20:08, "Griffith, Brent" <brent.griffith@xxxxxxxx> wrote:

 

The trend array is not exactly the same thing as the Erl variable being trended.  You donâ??t set values in the actual trend array yourself, EMS does it for you at the end of the zone timestep.  The bump doesnâ??t occur until the end of the zone timestep and is not associated with any Erl program execution.  It occurs right after the calling point EndOfZoneTimestepAfterZoneReporting has executed.

 

If you want to retrieve the value for the current timestep, use the native Erl value being trended instead of the trend itself.  

 

When accessing the trend, the index 1 is for the previous zone timestep, the first historical value. Zero index is not going to work.

 

 

From: EnergyPlus_Support@xxxxxxxxxxxxxxx [mailto:EnergyPlus_Support@xxxxxxxxxxxxxxx] On Behalf Of Jean marais
Sent: Monday, June 17, 2013 7:16 AM
To: EnergyPlus_Support@xxxxxxxxxxxxxxx
Subject: [EnergyPlus_Support] EMS Trend variable array

 

 

If I assign a value to the trend variable array, like so:
SET TrdVar1 = 1,
I assume the last possition of the array (this timestep) will be overwritten, correct?

Q) If I do this twice, does it "bump" all the values down a knotch, i.e.
[0 0 0 0 0 0 0] SET 1 --> [0 0 0 0 0 0 1]
[0 0 0 0 0 0 1] SET 2 --> [0 0 0 0 0 1 1]
in the same timestep?

Q) Which integer value refers to this timestep, Zero or 1?

Jean



__._,_.___


Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx

The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.




Your email settings: Individual Email|Traditional
Change settings via the Web (Yahoo! ID required)
Change settings via email: Switch delivery to Daily Digest | Switch to Fully Featured
Visit Your Group | Yahoo! Groups Terms of Use | Unsubscribe

__,_._,___