[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

[EnergyPlus_Support] hourly load variables?





Hey all,

 

Quick question on what seems like it should be a simple issue. What variable or meter can I use to extract the hourly loads of the building (or specific zones) in EnergyPlus? Looking in the .rdd and .mdd files, I don’t see what looks right.

 

For now I’m using this variable: Cooling:EnergyTransfer [J](Hourly)

 

But I can’t find that defined in the engineering reference. I’m assuming that if the cooling system meets the loads in all hours, that will be equivalent to the loads, but I can’t find the load calculation directly.

 

Thanks,

Neal

 

NEAL HUMPHREY | Senior Associate |  chrome-extension://lifbcibllhkdhoafpjfnlhfpfgnpldfl/numbers_button_skype_logo.png919.449.6879 | nhumphrey@xxxxxxxx

ICF INTERNATIONAL | 9300 Lee Highway, Fairfax, VA 22031 | icfi.com

 

 



__._,_.___


Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx

The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.




Your email settings: Individual Email|Traditional
Change settings via the Web (Yahoo! ID required)
Change settings via email: Switch delivery to Daily Digest | Switch to Fully Featured
Visit Your Group | Yahoo! Groups Terms of Use | Unsubscribe

__,_._,___