[EnergyPlus_Support] Shading of many overhangs and calculation time





Hello,

I'm working on a high-rise tower block. I'd like to model balcony overhangs that provide shading to the glazing below.

There are 3 objects I can think of using:
1. Shading:Building
2. Shading:Zone:Detailed
3. Shading:Overhang

Knowing that I have about 500 balcony overhangs, I'm wondering if there are significant differences in terms of calculation time between these 3 options.

My thinking is that a Shading:Overhang object is only shading the glazing it's attached to. Whereas, for the 2 other options, E+ has to calculate the effect of each shading surface on all the other building surfaces in view.

Does it make that much difference?

Many thanks,
Patrick





__._,_.___


Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx

The primary EnergyPlus web site is found at:
http://www.energyplus.gov

The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/

Attachments are currently allowed but be mindful that not everyone has a high speed connection.  Limit attachments to small files.

EnergyPlus Documentation is searchable.  Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.




Your email settings: Individual Email|Traditional
Change settings via the Web (Yahoo! ID required)
Change settings via email: Switch delivery to Daily Digest | Switch to Fully Featured
Visit Your Group | Yahoo! Groups Terms of Use | Unsubscribe

__,_._,___