Look at the simulation control and tell if run simulation for sizing periods its "yes" or "no"
No matter what I do to the design period it still only does simulations for one day in January and one in July. When I change the output to monthly it changes the names to January and July, but it is still only for those two days. Could you possibly look at the file and see what I need to do differently?Thank you
On Tuesday, February 11, 2014 6:59 AM, Oscar Hernandez <eng.ohw@xxxxxxxxx> wrote:
Look at the eplus simulations parameters. Run simulation for design periods.Good luckOn Feb 11, 2014 1:53 PM, <brick_13_13@xxxxxxxxx> wrote:I am struggling quite a bit with what seem to be basics. While running the example file AirflowNetwork_Multizone_House.idf I cannot figure out how to change the outputs, no matter what I add or change I cannot seen to see differences. I am concerned with the meter output, I want simple monthly energy uses, but I want them for the full year, not just the design days. Can anyone check out this example file and let me know what I need to do for a full years meter file?
__._,_.___
Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx
The primary EnergyPlus web site is found at:
http://www.energyplus.gov
The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/
Attachments are currently allowed but be mindful that not everyone has a high speed connection. Limit attachments to small files.
EnergyPlus Documentation is searchable. Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.
Your email settings: Individual Email|Traditional
Change settings via the Web (Yahoo! ID required)
Change settings via email: Switch delivery to Daily Digest | Switch to Fully Featured
Visit Your Group | Yahoo! Groups Terms of Use | Unsubscribe
__,_._,___