ÂHi all,We will have a schedule whose interval is set to 1 minute for a whole year, that is, there are 365*24*60 line items for the schedule.  ÂIs it allowed in EPlus to specify so many lines for Schedule:Compact? Because generating the schedule needs some time and design, I need to know whether it is possible to allow using such a large amount of lines in EnergyPlus beforehand.ÂThank you,Sean--James V Dirkes II, PE, BEMP, LEED AP
CEO/President
The Building Performance Team Inc.
1631 Acacia Dr, GR, Mi 49504
Direct: 616.450.8653
jim@xxxxxxxxxxxxxxxxxxxxxxxxxxx
Website l  LinkedIn
Studies show that four out of every three people have a hard time with math.
__._,_.___