Âhi all ,
I wonder if I can make an equipment availability schedule (defined in schedules) accourding to an if condition imposed on certain node values .
Meaning for example if OA node enthalpy is less than value defined then equipment will be available (1) else its not (0)
--James V Dirkes II, PE, BEMP, LEED AP
CEO/President
The Building Performance Team Inc.
1631 Acacia Dr, GR, Mi 49504
Direct: 616.450.8653
jim@xxxxxxxxxxxxxxxxxxxxxxxxxxx
Website l  LinkedIn
Love is the bridge over which Truth travelsÂ
__._,_.___
Posted by: Jim Dirkes <jim@xxxxxxxxxxxxxxxxxxxxxxxxxxx>
Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx
The primary EnergyPlus web site is found at:
http://www.energyplus.gov
The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/
Attachments are currently allowed but be mindful that not everyone has a high speed connection. Limit attachments to small files.
EnergyPlus Documentation is searchable. Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.
__,_._,___
- Follow-Ups:
- Re: [EnergyPlus_Support] Availability schedule if condition
- From: alyelhefni@xxxxxxxxx [EnergyPlus_Support]
- References:
- [EnergyPlus_Support] Availability schedule if condition
- From: alyelhefni@xxxxxxxxx [EnergyPlus_Support]
- Prev by Date: [EnergyPlus_Support] Availability schedule if condition
- Next by Date: Re: [EnergyPlus_Support] Availability schedule if condition
- Previous by thread: [EnergyPlus_Support] Availability schedule if condition
- Next by thread: Re: [EnergyPlus_Support] Availability schedule if condition
- Index(es):