Checkout the availability manager section. Otherwise EMS.
Âhi all ,
I wonder if I can make an equipment availability schedule (defined in schedules) accourding to an if condition imposed on certain node values .
Meaning for example if OA node enthalpy is less than value defined then equipment will be available (1) else its not (0)
__._,_.___
Posted by: Jean Marais <jeannieboef@xxxxxxxxx>
Primary EnergyPlus support is found at:
http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx
The primary EnergyPlus web site is found at:
http://www.energyplus.gov
The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/
Attachments are currently allowed but be mindful that not everyone has a high speed connection. Limit attachments to small files.
EnergyPlus Documentation is searchable. Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.