How can I use a schedule's value inside EMS ?I have a schedule in energyplus and I want to use the value of this schedule in each time step in the EMS code.like : IF (schedule value) > 0.009thanks __._,_.___
How can I use a schedule's value inside EMS ?
I have a schedule in energyplus and I want to use the value of this schedule in each time step in the EMS code.
like :Â
IF (schedule value) > 0.009
thanks