I have a model with an 8 zone VAV system. To model my building, I have forced to system to operate at maximum flow and 100% outside air. The actual building air flow is 100% outdoor air with total flow adjusted dynamically by a monitor
I can’t duplicate easily (how active a cooking grill is). I tried using an EMS routine to reset the air flow mass at the inlet node of the zone terminal units using a mass flow schedule. The EDD file shows that my calculations are working, but the CSV file
flow and energy use are not changing. (I’ve tried alternate EMS calculation points to no avail.) My question is do I have to reset all node flows in the air loop model to force the system to calculate at a different total air flow rate, or is there some other node location (like mixed air outlet) that would ripple the change through
the system? Thanks in advance… Ned Lyon, P.E. (MA, WV) 781.907.9000 main __._,_.___ Posted by: "Edward G. Lyon" <EGLyon@xxxxxxx> EnergyPlus support is found at: http://energyplus.helpserve.com or send a message to energyplus-support@xxxxxxxx The EnergyPlus web site is found at: http://www.energyplus.net/ The group web site is: http://groups.yahoo.com/group/EnergyPlus_Support/ Attachments are currently allowed but be mindful that not everyone has a high speed connection. Limit attachments to small files. EnergyPlus Documentation is searchable. Open EPlusMainMenu.pdf under the Documentation link and press the "search" button. __,_._,___ |