I am trying to model the following:
 
I have several water cooled condensers and I would like to reject their
heat to take care of the process load that exists on my DHW Loop, which
is served by a steam meter. I have tried using a WHLP as a primary with
the DHW loop as secondary, and vice versa. I have been unable to get
eQuest to allow something like this as it gives me error messages saying
that both a DHW and a WLHP cannot be specified as a primary loop.
 
Has anyone been successful in doing something with WLHPs?
 

Thanks,

Aaron Etzkorn, EIT
Engineer I

TAC
16011 College Blvd, Suite 212
Lenexa, KS  66219

Direct:  +1 (913) 469-0203  
Fax:      +1 (913) 469-0206
Mobile:  +1 (913) 620-3291
Email:   Aaron.Etzkorn at tac.com
Web:     www.tac.com <http://www.tac.com/> 

Notice: This email message, together with any attachments, contains
information of TAC, which may be confidential, proprietary, copyrighted
and/or legally privileged. This email is intended solely for the use of
the individual or entity named on the message. If you are not the
intended recipient, and have received this message in error, please
immediately return by email and then delete it.  

 

P  Please consider the environment before printing this e-mail. Thank
you.

 
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20081124/596d3b53/attachment.htm>


More information about the Equest-users mailing list