[Equest-users] delayed walls warning
Ryan Lacey
ryan at petersenengineering.com
Tue Jan 27 05:46:50 PST 2009
Hello,
I am not sure what I did to yield these warnings:
SPACE 125 Office has 4 delayed walls, 0 delayed floors and 0 delayed
ceilings. There should be at least a delayed wall and floor, a delayed wall
and ceiling, or a delayed ceiling and floor for custom weighting factors to
be calculated. ASHRAE weighting factors with floor weight of 70 lb/ft2 (342
kg/m2) will be used for this space. (lLineNum = 1000000)
The warnings show up when the file loads. Does anybody have any experience
in correcting these errors?
Thanks,
Ryan Lacey
LEED AP
Petersen Engineering, Inc.
PO Box 4774
6 Market Square
Portsmouth, NH 03801
Phone 603.436.4233 x113
Fax 603.436.4294
www.petersenengineering.com
ryan at petersenengineering.com
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20090127/9102fba3/attachment.htm>
More information about the Equest-users
mailing list