[Equest-users] Hours outside of throttling range -VAV system
Howe, Timothy
Timothy.Howe at stantec.com
Tue Jan 20 12:27:54 PST 2009
Go to: Air-side HVAC System Parameters -> Fans -> Night Cycle Control ->
Select: Cycle on any.
Timothy Howe, MS, LEED(r) AP
Mechanical Engineer
________________________________
From: equest-users-bounces at lists.onebuilding.org
[mailto:equest-users-bounces at lists.onebuilding.org] On Behalf Of James
Geers
Sent: Tuesday, January 20, 2009 3:13 PM
To: equest-users at lists.onebuilding.org
Subject: [Equest-users] Hours outside of throttling range -VAV system
I likewise have been having enormous trouble reducing the hours outside
of the throttling range for my design case building. In the winter
months in the morning I will have multiple hours outside of the
throttling range for multiple zones and this exceeds 300 hours.
Things I have varied but did not solve the problem include:
1. Occupancy schedule
2. Heating Design Day Schedule
3. Night Setback Temperature
4. Boiler Size
5. Loop Capacity
6. Pump Size
7. Delta T for heating and Pre-heating coils
8. Minimum Outside Air
9. Throttling Range
10. Design temperature
At this point I am randomly changing settings to reduce the amount of
hours outside of throttle range, but I would like to have a more
deductive process.
I have a suspicion that there was a setting in the wizard that is
overriding my inputs, but that is conjecture.
My engineer designed the system in Trane Trace and oversized it by 25%
so the designed heating equipment should be adequate.
Thank you,
James F. Geers
Registered Architect
LEED Accredited Professional
SFA Architects
300 West Fourth Street
Cincinnati, Ohio 45202
513.721.0600
513.721.0611 (fax)
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20090120/dd6007b5/attachment-0001.htm>
More information about the Equest-users
mailing list