[Equest-users] Exterior Lighting
Mathew Higgins
higgins at edi-arch.com
Fri Jan 2 08:14:36 PST 2009
Seth - If you access your electric meter you can find direct loads,
which is where eQuest generates a KW number based on building attributes
and operated by an exterior lighting schedule.
Matthew Higgins, LEED AP + ASHRAE-HBDP
Technical Specialist
Environmental Dynamics, Inc.
Architecture and Sustainability Consulting Services
505.242.2851
Any data provided by the Consultant, verbal or written, are to be considered opinions of building energy and/or daylight performance. The Client understands that the Consultant has no control of occupant habits, equipment or material performance or characteristics, site or climate conditions or the Contractor's method of assembly, and that the Consultant's opinions regarding building energy/daylight performance are made on the basis of the Consultant's professional judgment and experience. The Consultant makes no warranty, express or implied, that the energy/daylight performance of the building will not vary from the Consultant's opinion of building energy/daylight performance.
Seth P. Spangler wrote:
> Hello -
>
> It’s Friday and I’m only working at half capacity – Can anyone please
> tell me where I can find the exterior lighting input in detailed edit
> mode.
>
> Thanks and Happy New Year!
>
> Seth Spangler, LEED® AP
>
> Design Engineer
>
> RMF Engineering, Inc
>
> Ph: (843) 971-9639 ext:1497
>
> Fax: (843) 971-9641
>
> sspangle at rmf.com
>
>------------------------------------------------------------------------
>
>_______________________________________________
>Equest-users mailing list
>http://lists.onebuilding.org/listinfo.cgi/equest-users-onebuilding.org
>To unsubscribe from this mailing list send a blank message to EQUEST-USERS-UNSUBSCRIBE at ONEBUILDING.ORG
>
>
More information about the Equest-users
mailing list