ASHRAE 90.1-2004 appendix G states that these plug and other loads shall
be included in both baseline and proposed design. If you have more
efficient HVAC system for your proposed design, it will actually help
you. A microwave or oven maybe not be, but refrigerator will run
continuously and add heat into space. This makes HVAC system to run
more.