[Equest-users] equipment control
Angel pastor
angel_p_f at yahoo.es
Thu Nov 19 04:04:52 PST 2009
Dear all:
We´re currently working with DOE 2.2 v 4.2, and we find that when we try to define a chiller control sequence, when we simulate, none of the two
available chillers is working.
We copy here the *.inp paragraphs corresponding to cool loop and control
definition, just in case somebody can give us a clue about it.
$
------------------------------
---------------------------
$
Circulation Loops
$
---------------------------------------------------------
"Circuito AGUA FRIA" = CIRCULATION-LOOP
TYPE = CHW
COOL-EQUIP-CTRL =
"CONTROL"
$
---------------------------------------------------------
$
Equipment Controls
$
---------------------------------------------------------
"CONTROL" = EQUIP-CTRL
TYPE = COOLING
CIRCULATION-LOOP = "Circuito AGUA FRIA"
CHILLERS-1 = ( "p1","p2" )
CHILLERS-SEQ-1
= ( 1 , 2 )
..
In addition, a warning
appers: "equip-ctrl: control has a storage sequence
number specified, but no storage device is attached". But we have not defined
any storage device or storage sequence.
We attach to this mail the
corresponding *.inp file.
Thank you very much
in advance.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20091119/b3ceb502/attachment.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: case.INP
Type: application/octet-stream
Size: 22420 bytes
Desc: not available
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20091119/b3ceb502/attachment.obj>
More information about the Equest-users
mailing list