[Equest-users] LEED Compliance and Ceiling Plenums
Brian Tysoe
BTysoe at mcw.com
Fri Apr 29 07:09:30 PDT 2011
Hi everyone,
I am trying the LEED compliance feature of eQuest 3.64 and it does not seem to like my ceiling plenums.
Whether I set TYPE-ZONE as "plenum" or "unconditioned"; and whether I set ASHRAE 90.1 conditioning classification (reference) to "Not Included", "Unconditioned, Enclosed" or "Semiheated, RA Plenum" I always get the same error message:
"Assign zone to baseline floor system: CRule: Eval() error posting symbolic (value 5.18473e-296) result to BDL"
I found a discussion in the archives about this, but there was no solution other than removing the ceiling plenums. Is this really the only solution? Or is there a way to get it to work with ceiling plenums?
http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/2010-August/005875.html
Thanks,
Brian Tysoe M.A.Sc., P.Eng., LEED AP
Mechanical Engineer
MCW Consultants Ltd. <http://www.mcw.com>
600-156 Front Street West
Toronto, ON M5J 2L6
Phone 416-598-2920
Fax 416-598-5394
This e-mail may be privileged and confidential. Any unauthorized use is strictly prohibited. If you received this e-mail in error, please contact the sender directly.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20110429/e772a40a/attachment.htm>
More information about the Equest-users
mailing list