M. Shields mshields at fstrategies.com
Fri Apr 1 12:53:24 PDT 2011


You can add a sub meter and then change each type of load under the air-side
system tab, lighting, equip, etc are all different options under there,
however, if you have multiple types of the same load as far as I can tell
that is not possible (ie two lighting loads, or two equipment loads for the
same space.

 

Michael Shields

 

From: equest-users-bounces at lists.onebuilding.org
[mailto:equest-users-bounces at lists.onebuilding.org] On Behalf Of Colwell,
Bryce
Sent: Friday, April 01, 2011 2:46 PM
To: equest-users at lists.onebuilding.org
Subject: [Equest-users] Sub metering for LEED CS

 

All,

 

I have a project that is pursuing LEED CS 2009 where tenant areas and common
areas need to be metered separately by end use (lighting, plug loads, etc).
I have set up two zones on each floor and switched to the detailed mode.
Then I added a tenant meter and a common area meter, however I can not
figure out the next step of assigning the meters to those zones.  I can see
where in the Electric Meter Properties interface, under the direct loads
tab, you can input loads (kW) to specific end uses, however this only ADDs
consumption to the meters, it doesn't delineate consumption.

 

Any advice would be greatly appreciated.

 

Best Regards,

 

Bryce Colwell LEED AP BD+C, BPI, HERS

Sustainability Professional

KEMA Services, Inc.

155 Grand Avenue, Suite 500

Oakland, CA  94612

T  +1 510 891 0446 x44111

F  +1 510 891 0440

 <http://www.kema.com/> www.kema.com

 

 

 

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20110401/5848270d/attachment-0002.htm>


More information about the Equest-users mailing list