[Equest-users] Process flow on hot water loop

R B slv3sat at gmail.com
Mon Feb 21 18:08:30 PST 2011


I am simulating the domestic hot water consumption as process flow on the
hot water loop. But it is not showing up in the results (the beps report is
same with 0 gpm vs 11.1 gpm, and the schedule is non-zero). Am I missing
something or is there a bug?
-Rohini
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20110221/d671c7b3/attachment.htm>


More information about the Equest-users mailing list