To add a quick bit to the discussion:

 

Report PS-B provides monthly consumptions and for each meter - I use it
in tandem with sub-meters to track monthly process loads separate from
plug loads, for LEED documentation.

 

~Nick     

 

 

 

NICK CATON, E.I.T.

PROJECT ENGINEER

Smith & Boucher Engineers

25501 west valley parkway

olathe ks 66061

direct 913 344.0036

fax 913 345.0617

www.smithboucher.com 

 

From: equest-users-bounces at lists.onebuilding.org
[mailto:equest-users-bounces at lists.onebuilding.org] On Behalf Of Sami,
Vikram
Sent: Thursday, March 17, 2011 4:04 PM
To: Patrick J. O'Leary, Jr.; Varkie C Thomas
Cc: Equest Users Mailing List
Subject: Re: [Equest-users] Sub-Metering

 

*         I might be wrong here, but I think what you really want to do
is create a second meter (not submeter) in eQUEST. I don't think your
sim file reports out submeter energy separately in your BEPS & BEPU
reports. 

 

*         When you create a second meter - make sure you add it to your
corresponding rate structure.

 

*         Once you have a second meter - you can assign different
components to it - either by default (to change the whole category) or
individually. 

 

 

 

We've moved!  Please note our new address. 

Vikram Sami, LEED AP BD+C

Sustainable Design Analyst

1315 Peachtree St. NE, Atlanta, GA 30309

t: 404-443-7462    f: 404.892.5823       e: vikram.sami at perkinswill.com
www.perkinswill.com <http://www.perkinswill.com/> 

Perkins+Will.  Ideas + buildings that honor the broader goals of society

 

 

From: equest-users-bounces at lists.onebuilding.org
[mailto:equest-users-bounces at lists.onebuilding.org] On Behalf Of Patrick
J. O'Leary, Jr.
Sent: Monday, March 14, 2011 4:44 PM
To: Varkie C Thomas
Cc: Equest Users Mailing List
Subject: Re: [Equest-users] Sub-Metering

 

you can sub-meter each shell.  just be careful on how many meters you
apply to a model though.  25 meter limit max.  you can make more but the
energy & $ applied to meters in excess of the 25 limit won't report.
typically i just create these in detailed mode by copying & pasting in
from my own set of masters.  though i should note i do use the wizard to
create the external lighting power meter so the schedule is already
setup when i transition to detailed mode.  then i assign the external
power schedules to the meters i create for external power. 

look in the DOE22Vol1-Basics.pdf file you can download from the same
site as equest.  page 164 has an example that won't cut & paste here
properly so here's one i've used before.

em1 = master meter
em-3 & em-4 are two different buildings assigned to em1
em-3- submeters are assigned to em-3
em-4- submeters are assigned to em-4

e-tr is the tradable exterior lighting power meter
e-nt is the non-tradable exterior lighting power meter

"EM1" = ELEC-METER      
   TYPE             = UTILITY
   BLDG/SUB-METERS  = ( "EM-3", "EM-4" )
   ..
"EM-3" = ELEC-METER      
   TYPE             = BUILDING
   SUB-METERS       = ( "EM-3-1", "EM-3-LTG", "EM-3-PRC" )
   ..
"EM-4" = ELEC-METER      
   TYPE             = BUILDING
   SUB-METERS       = ( "EM-CORE", "EM-4-1", "EM-4-LTG", "EM-4-PRC", 
         "EM-CORE-LTG", "EM-CORE-PRC" )
   ..
"EM-3-1" = ELEC-METER      
   TYPE             = SUB-METER
   ..
"EM-3-LTG" = ELEC-METER      
   TYPE             = SUB-METER
   ..
"EM-3-PRC" = ELEC-METER      
   TYPE             = SUB-METER
   ..
"EM-CORE" = ELEC-METER      
   TYPE             = SUB-METER
   ..
"EM-4-1" = ELEC-METER      
   TYPE             = SUB-METER
   ..
"EM-4-LTG" = ELEC-METER      
   TYPE             = SUB-METER
   ..
"EM-4-PRC" = ELEC-METER      
   TYPE             = SUB-METER
   ..
"EM-CORE-LTG" = ELEC-METER      
   TYPE             = SUB-METER
   ..
"EM-CORE-PRC" = ELEC-METER      
   TYPE             = SUB-METER
   ..
"E-TR" = ELEC-METER      
   TYPE             = UTILITY
   EXTERIOR-POWER   = ( 5.723 )
   EXTERIOR-SCH     = ( "Ext Lighting Sch" )
   EXTERIOR-EU      = ( EXT-USAGE )
   ..
"E-NT" = ELEC-METER      
   TYPE             = UTILITY
   EXTERIOR-POWER   = ( 1.42 )
   EXTERIOR-SCH     = ( "Ext Lighting Sch" )
   EXTERIOR-EU      = ( EXT-USAGE )
   ..

On 3/14/11 1:30 PM, Varkie C Thomas wrote: 

How do you sub-meter (electric and fuel) a System or an Equipment in
Plant?  Can you sub-meter each Shell?  Which summary report gives the
energy use per month by sub-meter?  Is there documentation on how to do
this? 

 
 
_______________________________________________
Equest-users mailing list
http://lists.onebuilding.org/listinfo.cgi/equest-users-onebuilding.org
To unsubscribe from this mailing list send  a blank message to 
EQUEST-USERS-UNSUBSCRIBE at ONEBUILDING.ORG
  

 


This email and any files transmitted with it are confidential and
intended solely for the addressee. If you are not the named addressee
you should not disseminate, distribute, copy, or alter this email.

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20110317/fa3cd705/attachment-0002.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: image/jpeg
Size: 1459 bytes
Desc: image001.jpg
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20110317/fa3cd705/attachment-0002.jpeg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: image/png
Size: 158468 bytes
Desc: image002.png
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20110317/fa3cd705/attachment-0002.png>


More information about the Equest-users mailing list