[Equest-users] equest/leed 3.0 question

Patrick J. O'Leary, Jr. poleary1969 at gmail.com
Wed Mar 23 12:16:04 PDT 2011


i am looking at the leed "EAp2 Section 1.4 tables.xls" file for a leed 
3.0 project & there is a section for "Model Input Parameter/Energy 
Efficiency Measure" for the baseline and proposed case feeder voltage 
drop and branch circuit voltage drop.

has anyone filled this out yet?  to the best of my knowledge these are 
not items than can be input into equest.  or hap.  or trace.  both are 
calculations based on the run from the service entrance to the breaker 
panel(s) and the longest run to an electrical load from the breaker 
panel(s) (the branch drop).

regards,
patrick



More information about the Equest-users mailing list