[Equest-users] unmet heating hours ? simultanous heating/cooling
Ginnie Schofield
GSchofield at edaengineering.com
Tue Apr 9 14:50:26 PDT 2013
All:
Could really use some help on this.
My cooling plant is operating through the winter, nights, holidays and weekends.
I have reviewed my schedules, and cannot find what parameter I need to change to get the
chiller/space cooling to NOT operate during unnecessary times.
Once I figure this out, I believe I can be done with this model and onto the next.
Thank you in advance for your assistance. I did post the .inp & .pd2 files initially but would be happy to do so again.
GINNIE SCHOFIELD
ENGINEERING DESIGN ASSOCIATES
1607 CY Ave, Ste 303, Casper, WY 82604
(Ph) 307-266-5033 (Fx) 307-234-3805