Hi All,



How to find out building's total load in eQuest output file?

The meaning of building’s total load here is the loads due to lighting,
equipment, occupancy, infiltration, wall, roof and glass.

I want to find out the complete load of the building due to above
components for both conditioned and unconditioned spaces.



I am finding different loads in LS-C (Total load 46 TR), SS-D (Maximum
cooling load 100 TR) and PS-H (Cooling capacity 250 TR) command.

How can I correlate these commands? LS-C only captures the loads of the
conditioned spaces.



Systems cooling capacities are modeled as default in the model. Hence, the
model has automatically sized the equipment. Throttling is zero.



Thanks in advance!!



Best Regards,

* *

Bhanu
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20130813/6706c44f/attachment.htm>


More information about the Equest-users mailing list