[Equest-users] Process Load / Baseline vs Proposed

Jeff Ross-Bain jeff at rbgb.com
Mon Jul 1 09:45:18 PDT 2013


Hi All,

My Process load value for proposed is higher than Baseline but also has an
interesting twist: The proposed BEPU value (misc. loads) is less than the
PS-F value. These are usually the same. 
I have compared all equipment process values which match (BL and Prop) and
even checked the crankcase heat inputs.
Any idea where else I can look ?
Thanks,