[Equest-users] PROBLEMS Drawing building footprint

David Griffin dgriffin at etcgrp.com
Tue Jul 2 13:11:27 PDT 2013


Santiago,

Make sure you draw your building footprints and zones counter-clockwise.

Drawing the building as three shells will spare you process of some detailed mode editing.

Thanks,

David Griffin
Energy Analyst
ETC Group, LLC
801.278.1927 ext. 128
Cell 480.235.0899
Fax 801.486.0668
dgriffin at etcgrp.com<mailto:dgriffin at etcgrp.com>

[Copy of ETC_LogoOnly2_rgb_sm.png]
1997 South 1100 East, Suite 201, Salt Lake City, UT 84106-4471 - www.etcgrp.com<http://www.etcgrp.com/>
-------------------------------------------------------------------------------------------------------------------
CONFIDENTIALITY NOTICE This e-mail transmission, and any documents, files or previous e-mail messages attached to it may contain confidential information that is legally privileged.  If you are not the intended recipient or the person responsible for delivering it to the intended recipient, you are hereby notified that any disclosure, copying, distribution or use of any of the information contained in or attached to this transmission is strictly prohibited.  If you have received this transmission in error, please immediately notify us by telephone at (801) 278-1927 and destroy the original transmission and its attachments without reading them. Thank you.

From: Santiago Ferreyra [mailto:santiag987 at hotmail.com]
Sent: Monday, July 01, 2013 11:13 PM
To: equest-users at lists.onebuilding.org
Subject: [Equest-users] PROBLEMS Drawing building footprint

Hello, I am a beginner in equest, I started drawing the footprint building but some errors occurred because I did not get the  3d form.

 I have to draw a hospital two-story building, the plans indicate that the stairs on the ground floor is separated from the rest of the building (only connected on the top floor)....should i first draw the ground floor without stairs? then should draw the stairs creating another building envelope in the same level (in the ground floor) to draw the stairs? and finally create another building envelope for the top floor?

any advice or help is welcome

thanks

link dropbox with the open studio model: https://www.dropbox.com/sh/kzzh4uo5zt155u6/gzJwD1jbd_

Hola, soy principiante en equest, empece dibujando la planta del edificio pero ocurrieron algunos errores porque no resulto la forma tridimensional correcta.

Tengo que dibujar un hospital de dos pisos, segun planos la caja de la escalera esta separada del edificio en la planta baja (solo se une al cuerpo del edificio en planta alta)...deberia primero dibujar la planta baja sin la caja de la escalera (porque equest no me deja opcion), luego deberia dibujar la caja de la escalera creando una nueva envolvente  (create building envelope) al mismo nivel (en planta baja)? y finalmente crear otra envolvente para el segundo nivel?

* en caso de estar equivocado me podrian decir el orden en que se debe dibujar cada planta

cualquier consejo o ayuda es bienvenida

gracias

dibujo del edificio: https://www.dropbox.com/sh/kzzh4uo5zt155u6/gzJwD1jbd_


Santiago (Arg)


-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20130702/39a55c77/attachment-0001.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.jpg
Type: image/jpeg
Size: 1559 bytes
Desc: image001.jpg
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20130702/39a55c77/attachment-0002.jpg>


More information about the Equest-users mailing list