I did that and then lost all space references to zones and next-to references for interior walls.
Kind Regards,
Kevin
From: John Aulbach [mailto:jra_sac at yahoo.com]
Sent: Monday, April 07, 2014 2:09 PM
To: Kevin Kyte; Kathryn Kerns; equest-users at lists.onebuilding.org
Subject: Re: [Equest-users] eQUEST v3.65 build 7163 released Mar 18 2014 - fixes hourly report viewer
I am going to try a real "barn burner", something i have had limited success with. Save your file, make a play copy, then take the play copy and reconvert to Wizard. Dont worry about losing your references. Make your changes for zoning, including windows.
Then "cookie cutter" your new spaces into the original .INP file (you need to keep your original file intact, and only deal with "copies of copies. Dont forget to include your new polygons (replace all of them ??).
I think this can work.
John R. Aulbach, PE
From: Kevin Kyte <KKyte at watts-ae.com<mailto:KKyte at watts-ae.com>>
To: Kathryn Kerns <kathryn.kerns at bceengineers.com<mailto:kathryn.kerns at bceengineers.com>>; "equest-users at lists.onebuilding.org<mailto:equest-users at lists.onebuilding.org>" <equest-users at lists.onebuilding.org<mailto:equest-users at lists.onebuilding.org>>
Sent: Monday, April 7, 2014 10:21 AM
Subject: Re: [Equest-users] eQUEST v3.65 build 7163 released Mar 18 2014 - fixes hourly report viewer
It seems I can no longer edit the inp file without losing all references? Or is it just an edit that creates an error? I am afraid to go back and sketch the cad again just to lose it all again. It’s like I never did energy modeling before.
Kevin
From: Kathryn Kerns [mailto:kathryn.kerns at bceengineers.com]
Sent: Monday, April 07, 2014 12:42 PM
To: Kevin Kyte; equest-users at lists.onebuilding.org<mailto:equest-users at lists.onebuilding.org>
Subject: RE: [Equest-users] eQUEST v3.65 build 7163 released Mar 18 2014 - fixes hourly report viewer
Kevin, I understand your frustration. The most time wasting thing about eQuest is its inability to reorganize spaces easily within its Wizard footprint without going back into the Wizard and blowing out all the DE edits. Architects can’t leave floor plans alone, and inevitably, the final interior zones in a model are different from the zones you started with. My bosses have commented on this unfortunate issue more then once because it causes deadline delays.
Does anyone have some suggestions other than going back into the Wizard, reorganizing the zones, and then trying to insert the changes into the original DE model? Inserting the geometric changes seems to be the biggest problem. Has anyone found an easy way to do that?
From: equest-users-bounces at lists.onebuilding.org<mailto:equest-users-bounces at lists.onebuilding.org> [mailto:equest-users-bounces at lists.onebuilding.org] On Behalf Of Kevin Kyte
Sent: Monday, April 07, 2014 6:44 AM
To: equest-users at lists.onebuilding.org<mailto:equest-users at lists.onebuilding.org>
Subject: Re: [Equest-users] eQUEST v3.65 build 7163 released Mar 18 2014 - fixes hourly report viewer
I am entirely disappointed with the so called improvements to equest. Why suddenly when I have a space with an unreferenced zone and I recreate the reference to about 30 zones, then close and reopen, all work to unreferenced spaces is gone. Also, trying to implement floor plan revisions have always been the worst. This is uncalled for. In the 8 years or so that I have been using this program, it has improved very little overall and perhaps taken a step backwards in some regards. I have been telling myself to make this project the last one in equest for years now, even doing openstudio side-by-side with equest for the building form for many. It might be safe to say that equest is no longer the most productive. It does not bring me pleasure to write this, as I will have to do the painstaking process of becoming more familiar with openstudio and wasting a few hundred more hours. However, it seems that may be more worthwhile than dealing with the glitches and everyday slowisms of equest.
Kevin
From: Brian Fountain [mailto:bfountain at greensim.com]
Sent: Thursday, March 27, 2014 11:42 AM
To: equest-users at lists.onebuilding.org<mailto:equest-users at lists.onebuilding.org>
Subject: [Equest-users] eQUEST v3.65 build 7163 released Mar 18 2014 - fixes hourly report viewer
I was visiting doe2.com this morning (as you do from time to time -- you know) and found that there was a relatively recent release of a new v 3.65 build. From the “what’s new” document:
eQUEST v3.65
build 7163 – public release ~ 18 March 2014 – w/ DOE-2.2 v48r
Fixes:
• Fixed issues with the simulation detailed results viewer application (D2SimViewer.exe) that
prevented the viewing of hourly results in some instances (all appeared as zero values) when
the correct results were located on the simulation output file (the .sim file).
• Fixed issues with the installation procedure sometimes failing in cases where the installation is
directed to a drive mounted from a network location.
Since I just sent this to the whole mailing list, you may wish to wait for a few days before downloading the new build. I don’t want to cause an unexpected flood of download requests on the doe2.com site.
If others notice a new eQUEST release, please post a note here. I tend to miss them.
Cheers,
Brian
_______________________________________________
Equest-users mailing list
http://lists.onebuilding.org/listinfo.cgi/equest-users-onebuilding.org
To unsubscribe from this mailing list send a blank message to EQUEST-USERS-UNSUBSCRIBE at ONEBUILDING.ORG<mailto:EQUEST-USERS-UNSUBSCRIBE at ONEBUILDING.ORG>
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20140407/b78b0e6e/attachment-0002.htm>
More information about the Equest-users
mailing list