[Equest-users] Questions - water-side HVAC compliance inputs

Byron Burns B.Burns at ha-inc.com
Thu Jun 26 06:45:56 PDT 2014


Chris,

You may also want to review this manual as well.

http://www.usgbc.org/Docs/Archive/General/Docs7671.pdf

Byron D. Burns, EIT, BEMP
Energy Engineer, Building Sciences Studio

H&A Architects & Engineers | www.ha-inc.com<http://www.ha-inc.com>
d: (804) 420-1622 p: (804) 285-4171 f: (804) 217-8520

From: Equest-users [mailto:equest-users-bounces at lists.onebuilding.org] On Behalf Of Singhal, Harshul
Sent: Thursday, June 26, 2014 9:03 AM
To: Chris Baker; equest-users at lists.onebuilding.org
Subject: Re: [Equest-users] Questions - water-side HVAC compliance inputs

Chris

You can create steam meter at rate/utility side and then assign your loop to that meter. That way, you need not to assign any boiler/heater or their efficiencies. You will get amount of steam (which is coming from military installation)  in your results at separate meter. I hope it makes sense here.

Thanks
Harshul Singhal
Project Consultant
Thornton Tomasetti
386 Fore Street, Suite 401
Portland, ME  04101
T 207.245.6060  F 207.245.6061
D 207.245.6074
HSinghal at ThorntonTomasetti.com<mailto:HSinghal at ThorntonTomasetti.com>
www.ThorntonTomasetti.com<http://www.ThorntonTomasetti.com>
From: Equest-users [mailto:equest-users-bounces at lists.onebuilding.org] On Behalf Of Chris Baker
Sent: Wednesday, June 25, 2014 10:26 PM
To: equest-users at lists.onebuilding.org<mailto:equest-users at lists.onebuilding.org>
Subject: [Equest-users] Questions - water-side HVAC compliance inputs

Using eQuest 3.65
The building is a chapel here in Alaska.

Within the "Water-Side HVAC" module in Detailed Edit...
I currently have two loops set up


*        Hot Water Loop

*        DHW Plant 1 Loop Pump (1)

Hot Water Loop is my heating loop operated by the boiler, which isn't anywhere near the building, off-site (this is a military installation).
But I think this is still the correct way to model the system.  (Fossil Fuel/Electric hybrid).
The building gets steam through a utilidor but the steam is still heated using fossil fuels off-site by the energy contractor the government uses. - I digress

For the DHW loop,
I've set up my water heater , number of heaters, energy factor, tank ext R-value, etc..

[cid:image001.jpg at 01CF9123.6CE789B0]

But when I click on the properties of the parent loop system "DHW Plant 1 Loop Pump (1)" then "Process/DHW Loads" tab it asks for number of heaters, Tank volume, etc....  The same inputs I already set up for the water heater.

These are green inputs required for LEED compliance also.  So I'm kind of confused on how to show this...  Especially for the Heating loop where there are no other tanks or heaters.

The only tank on the DHW system is the Water Heater but that's all been specified already in "Domestic Water Heater Properties".

Should I leave these inputs blank since they are already set up for the water heater?  Thanks!

[cid:image002.jpg at 01CF9123.6CE789B0]

Chris Baker
CCI CAD Drafter


________________________________
CCI-Alliance Confidentiality notice: This message is intended only for the person to whom addressed in the text above and may contain privileged or confidential information. If you are not that person, any use of this message is prohibited. We request that you notify us by reply to this message, and then delete all copies of this message including any contained in your reply. Thank you.


<><><><><><><><><><><><><><><><><><><><><><><><><><><><><><><>



The information in this email and any attachments may contain



confidential information that is intended solely for the



attention and use of the named addressee(s). This message or



any part thereof must not be disclosed, copied, distributed



or retained by any person without authorization from the



addressee. If you are not the intended addressee, please



notify the sender immediately, and delete this message.



<><><><><><><><><><><><><><><><><><><><><><><><><><><><><><><>



-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20140626/53cb630a/attachment.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.jpg
Type: image/jpeg
Size: 64921 bytes
Desc: image001.jpg
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20140626/53cb630a/attachment.jpg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image002.jpg