[Equest-users] could not successfully allocate all energy to the 5-minute bins?
Wahid Mohamed
Wahid.Mohamed at diyar.com
Sun Mar 9 01:43:00 PST 2014
Dear Modeler,
I have got below "CAUTION" "& WARNING" from eQuest report. I wonder if anyone can help what it does mean, or a reference to interpret it.
**CAUTION**********************************************************************
System: AHU-B-01-Female Spa could not successfully
allocate all energy to the 5-minute bins during
heating because of an equipment overload. The peak
load used in ECONOMICS will not include the fraction
due to the overload, but the PLANT reports will.
Mon/Day/Hour: 1 1 3 Energy: 37.3 Unallocated: 0.254"
**WARNING**********************************************************************
Zone: 1stb Kitchen&Tlt Zn could not successfully
allocate all equipment energy to the 5-minute bins
because of an equipment overload. The peak load
used in ECONOMICS will not include the fraction due
to the overload, but the PLANT reports will.
Mon/Day/Hour: 12 29 7 Energy: 42.2 Unallocated: 3.443
Regards,
Wahid H. Mohamed, BSc, LEED AP BD+C
Mechanical Project Engineer
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/equest-users-onebuilding.org/attachments/20140309/cf2daa8a/attachment.htm>
More information about the Equest-users
mailing list