[BLDG-SIM] Natural Ventilation / Fire Separation
Olsen, Erik
eolsen at owpp.com
Wed May 26 10:03:34 PDT 2004
> I'm looking for natural ventilation projects that have succesfully dealt
> with restrictive fire separation requirements. Schools are of special
> interest, but any references would be helpful.
>
> The specific issue we are dealing with is a requirement in Chicago for
> 1-hour separation between classrooms and corridors; in the IBC there is no
> rating required in a sprinkled building. This makes strategies using
> airflow through the corridor less feasible. We are looking to show the
> city that others have succesfully and safely used this sort of strategy.
>
> Thanks and regards,
> Erik
>
> Erik Olsen
> OWP/P Engineers
> HVAC / Energy Consulting
> 111 West Washington Street, Suite 2100
> Chicago, Illinois 60602-2714
> 312.960.8313 Direct
> 312.827.8313 Fax
> eolsen at owpp.com
>
>
======================================================
You received this e-mail because you are subscribed
to the BLDG-SIM at GARD.COM mailing list. To unsubscribe
from this mailing list send a blank message to
BLDG-SIM-UNSUBSCRIBE at GARD.COM
More information about the Bldg-sim
mailing list