[BLDG-SIM] DOE Capabilities
Jason Glazer
jglazer at gard.com
Mon Jun 5 13:58:36 PDT 2000
Mike,
The DOE-2.1e program can simulate all of the systems that
you described. Combining electric centrifugal and direct
fired absorption chillers in a single plant with controls I
have done many times and it works well. The chillers can
be sequenced in a variety of ways to meet the load and the
sequencing can be modified hourly by schedules.
All three items are well documented in the "DOE-2
Supplement Version 2.1e" by Winkelmann, et al, November
1993 and comes with the DOE-2 documentation package.
Jason
On 3 Jun 2000, at 6:49, Lemmon, Mike wrote:
> I need to know if the DOE program can model the equipment
> and energy systems listed below. Any comments from users
> who have modeled any of these systems will be appreciated.
> Thanks
>
>
>
>
> Peak Shaving with a Gas generator
> Rejection of generator jacket water to heat exchanger and
> applied
> towards boiler water pre-heat.
>
> Ice Storage
> Partial Storage
>
> Hybrid Plants (switchover scheduling)
> Centrifugal
> Direct Fired Absorption
>
>
> Best regards,
>
> <<...>>
>
> Mike Lemmon
> Account Executive - Federal Sector Team
> The Trane Company
> Asset Management Services
>
> Phone (608) 787-4297
> Fax (801) 751-8574
> Cell (612) 845-4495
> E-mail mlemmon at trane.com
=========================================================
Jason Glazer, P.E. mailto:jglazer at gard.com 847 698 5686
GARD Analytics - http://www.gard.com/
Building Energy Simulation and Analysis
List Administrator for 90.1, GPC18 and BLDG-SIM
======================================================
You received this e-mail because you are subscribed
to the BLDG-SIM at GARD.COM mailing list. To unsubscribe
from this mailing list send a blank message to
BLDG-SIM-UNSUBSCRIBE at GARD.COM
More information about the Bldg-sim
mailing list