Although our company works with VisualDOE, this question is applicable to
DOE-2.1 in general.
If I model a VAV system with supply air temperature reset based on warmest
zone or an outside air schedule, this will at times cause the originally
satisfied VAV boxes to open further and increase fan power.
Is it possible to model static pressure reset where the static setpoint is
reduced if all boxes are satisfied? I'd be curious to see how the cost of
fan energy and heating/cooling energy varies between the two control
strategies.
Thanks.
Mike Busman, C.E.M.
Senior Project Engineer
NORESCO, LLC
17671 Cowan, Suite 206
Irvine, CA 92614
tel. 949-253-3533, ext. 303
fax 949-253-2049
======================================================
You received this e-mail because you are subscribed
to the BLDG-SIM at GARD.COM mailing list. To unsubscribe
from this mailing list send a blank message to
BLDG-SIM-UNSUBSCRIBE at GARD.COM
More information about the Bldg-sim
mailing list