[BLDG-SIM] 90.1-1999 - Budget Case System type
Chris Jones
cj at cr-jay.ca
Sun May 8 07:06:41 PDT 2005
Number 3 in the system type chart (Table 11.4.3A) states that the zones
shall all have Parallel Fan Powered boxes. Typically, interior zones do
not and the Parallel fans draw air from the interior zone/plenum. For
modelling for LEED, is it acceptable to have the interior zones as VAV boxes?
Chris Jones, P.Eng.
14 Oneida Avenue
Toronto, ON M5J2E3
Tel. 416 203-7465
Fax. 416 946-1005
======================================================