Dear All,
I am running a very simple model in eQuest. I would like to control the
blind operation based on the solar radiation levels and report its
operation in the simulation results document.
The set up I have at the moment is defined in the detailed mode, at
window level and goes as follows:
Shading Schedule: Schedule MULTIPLIER
Shading Type: Movable interior
Maximum Solar Schedule: Schedule RADIATION
Max Solar Control: Transmitted Total
Sun Control Probability: 1.0
Open shade schedule: undefined
Conductance min-T schedule: undefined
Solar Transmittance schedule: undefined
Is this correct? I have tried using something other than Schedule
MULTIPLIER in the shading schedule and it doesn't seem to work.
Do I need to define the undefined schedules. The help information is
confusing when available.
Finally how do I report this information in the simulation results
document. Any input would be greatly appreciated.
Kind Regards,
Kevin Burke
____________________________________________________________
Electronic mail messages entering and leaving Arup business
systems are scanned for acceptability of content and viruses
===========================
You received this e-mail because you are subscribed
to the BLDG-SIM at GARD.COM mailing list. To unsubscribe
from this mailing list send a blank message to
BLDG-SIM-UNSUBSCRIBE at GARD.COM
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20070620/ac6be4ba/attachment-0002.htm>
More information about the Bldg-sim
mailing list