One - How do you model exhaust fans that bring in OA for cooling with
automatic dampers?  The spaces also have unit heaters for heat.

Two- I am modeling a large kitchen with several sources of internal heat
loads.  I have modeled the HVAC system to represent the AHU/VAVbox system
serving the space.  However the space is also served by several makeup air
units and their associated exhasut hoods.  I am currently including all
heat gain from the equipment as space internal loads and am treating the
makeup air unit and exhaust fans as external loads.  This does not account
for any heat or humidity gained or lost by the makeup/exhaust system.  Does
anyone have any suggests for how to better model this scenario?

Three-How do you manipulate schedules to interact with the hourly reports?


Thank you,

Daryl

Daryl J Summerson, E.I.T.
STV Incorporated
205 W Welsh Dr
Douglassville, PA  19518
(610) 385-8562
Fax (610) 385-8501

Visit us at our redesigned website: http://www.stvinc.com.

The information contained in this electronic message is intended only for
the use of the individual or entity to which it is addressed and may
contain information that is privileged, confidential and exempt from
disclosure under applicable law.  If the reader of this message is not the
intended recipient, you are informed that any dissemination, copying or
disclosure of the material  contained herein, in whole or in part, is
strictly prohibited.  If you have received this transmission in error,
please notify STV and purge this message.


======================================================
You received this e-mail because you are subscribed 
to the BLDG-SIM at GARD.COM mailing list.  To unsubscribe 
from this mailing list send a blank message to 
BLDG-SIM-UNSUBSCRIBE at GARD.COM




More information about the Bldg-sim mailing list