[BLDG-SIM] Existing Buildings 90.1
Matthew Higgins
higgins at edi-arch.com
Thu Nov 1 08:46:14 PDT 2007
When modeling the baseline building for ASHRAE 90.1 Appendix G should
one assume that the following passage means to delete all new elements
from the proposed model to create the baseline. I am specifically
wondering about a section of roof that was raised to accommodate
clerestories.
Section 5. Building Envelope - Sub-section (f):
"Existing Buildings. For existing building envelopes, the baseline
building design shall reflect existing conditions prior to any revisions
that are part of the scope of work being evaluated."
Any help is appreciated.
--
Matthew Higgins, LEED AP
Green Building Program Technical Specialist
Environmental Dynamics, Inc.
Architecture and Sustainability Consulting Services
505.242.2851
======================================================
You received this e-mail because you are subscribed
to the BLDG-SIM at GARD.COM mailing list. To unsubscribe
from this mailing list send a blank message to
BLDG-SIM-UNSUBSCRIBE at GARD.COM
More information about the Bldg-sim
mailing list