[Bldg-sim] Title-24 Error Message
Mitchell Dec
mdec at glumac.com
Wed Apr 23 11:49:21 PDT 2008
All,
Has anyone encountered an error in eQUEST stating failure to designate a RUN PERIOD? The default "Entire Year" run period is assigned with the default dates ranging from 1/1/1996-12/31/1996 - does anyone know where the RUN PERIOD link to the T24 compliance simulation?
Any thoughts would be much appreciated.
Thanks,
Mitch
<?xml:namespace prefix = o ns = "urn:schemas-microsoft-com:office:office" />
Mitchell J. Dec
Senior Energy Analyst
LEED® Accredited Professional
<http://www.glumac.com/>
_____
320 SW Washington, Suite 200
Portland, OR 97204-2640
T. 503.227.5280 F. 503.274.7674
Direct: 503.345.6283
Thinking. Inside the building.
http://www.glumac.com/
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20080423/b1ddd68d/attachment-0002.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: image/gif
Size: 50453 bytes
Desc: image001.gif
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20080423/b1ddd68d/attachment-0002.gif>
More information about the Bldg-sim
mailing list