[Bldg-sim] eQuest- Furnace HIR vs Equipment HIR
Lam, Linda
linda.lam at sf.fk.com
Wed May 28 09:04:46 PDT 2008
Dear BldgSIM:
What is the difference between the FURNACE HIR input under the
air-side-systems>heating>unitary power tab and the EQUIPMENT HIR input
under water-side-systems>boiler ?
Thank you very much!
Linda
Linda Lam
FLACK + KURTZ
405 Howard St.
Suite 500
San Francisco, CA 94105
http://www.flackandkurtz.com <http://www.flackandkurtz.com/>
415.398.3833 Main
415.402.5813 Direct
415.433.5311 Fax
linda.lam at sf.fk.com
Ensuring that today's built environment preserves the natural
environment in which we live.
This e-mail may contain confidential and/or privileged information. If
you are not the intended recipient (or have received this e-mail in
error) please notify the sender immediately and destroy this e-mail.
Any unauthorized copying, disclosure or distribution of the material in
this email is strictly forbidden.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20080528/e0b8cd1d/attachment.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: image/gif
Size: 837 bytes
Desc: image001.gif
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20080528/e0b8cd1d/attachment.gif>
More information about the Bldg-sim
mailing list