[Bldg-sim] Baseline model unmet load hours eQUEST

Chatfield, Gary Gary.Chatfield at lv.fk.com
Thu May 29 11:48:03 PDT 2008


I am currently carrying out an ASHRAE 90.1 appendix G baseline model
which is showing me 350 unmet load hours. There is only one zone with
the unmet load hours, having looked at the Space temperature summary
SS-O for the zone it shows the hours are occurring before the fan
schedule switches on the fan, but my understanding of the unmet load
hours are only counted when the system is active.

 

If anyone has come across this previously and came up with a solution, I
would be grateful for any advice.

 

Gary Chatfield

LEED(r) AP      

  FLACK + KURTZ

385 Pilot Road

Suite D

Las Vegas, NV  89119

http://www.flackandkurtz.com <http://www.flackandkurtz.com/>   

702.897.8181 Main

702.352.9562 Direct

702.914.6966 Fax
gary.chatfield at lv.fk.com

Ensuring that today's built environment preserves the natural
environment in which we live.

This e-mail may contain confidential and/or privileged information. If
you are not the intended recipient (or have received this e-mail in
error) please notify the sender immediately and destroy this e-mail.
Any unauthorized copying, disclosure or distribution of the material in
this email is strictly forbidden.

 

 

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20080529/18007364/attachment.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: image/gif
Size: 837 bytes
Desc: image001.gif
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20080529/18007364/attachment.gif>


More information about the Bldg-sim mailing list