[Bldg-sim] LEED EA P2 requirement clarification

Bishop, Bill wbishop at pathfinder-ea.com
Mon Feb 8 12:31:03 PST 2010


Also, the User's Manual specifically addresses Alteration of Existing
Buildings on p.5-3, providing a list of envelope alterations that are
exempt from complying with the Standard. There are similar references in
the User's Manual to other mandatory provisions.
 
~Bill
________________________________

From: Carol Gardner [mailto:cmg750 at gmail.com] 
Sent: Monday, February 08, 2010 3:20 PM
To: Snarski, Marty
Cc: Bishop, Bill; bldg-sim at lists.onebuilding.org
Subject: Re: [Bldg-sim] LEED EA P2 requirement clarification
 
I agree with Bill. I, too, am not a LEED reviewer but I have been an
energy code reviewer and the interpretation was always that the code
requirements for insulation were for new buildings and existing building
where the wall was going to be modified. That makes sense where
requiring an existing building to have all walls modified would not.
LEED supports the reuse of existing materials as well as energy
efficiency so forcing a change would seem counter
intuitive.

Carol
On Mon, Feb 8, 2010 at 12:04 PM, Snarski, Marty <msnarski at shwgroup.com>
wrote:
Thanks, Bill.
 
That's pretty much been my interpretation, as well.  However, it was
suggested by some in the office that LEED specifically called for THAT
section (5.4) to be met to ensure that the whole envelope was brought up
to Section 5.4 requirements......and that got me second-guessing my
interpretation.
 
At any rate, I appreciate the input.
 
Martin Snarski  LEED(r) AP
SHWGROUP 
 
From: Bishop, Bill [mailto:wbishop at pathfinder-ea.com] 
Sent: Monday, February 08, 2010 3:01 PM
To: Snarski, Marty; bldg-sim at lists.onebuilding.org
Subject: RE: [Bldg-sim] LEED EA P2 requirement clarification
 
Martin,
 
I'll argue that you should not need to upgrade the envelope of an
existing building to meet Section 5.4 except where you are creating new
envelope surfaces (such as new building additions). Likewise, you should
not need to improve the efficiency of existing equipment per Section
6.4, as long as you are not replacing it with new. The scope of Standard
90.1-2007 (and -2004) includes:
1.)   new buildings and their systems
2.)   new portions of buildings and their systems
3.)   new systems and equipment in existing buildings
 
My standard disclaimer that I am not a LEED reviewer applies.
 
Regards,
Bill
 
William Bishop, EIT, LEED(r) AP | Pathfinder Engineers & Architects LLP
Mechanical Engineer
 
134 South Fitzhugh Street
Rochester, NY 14608
T: (585) 325-6004 Ext. 114
F: (585) 325-6005
wbishop at pathfinder-ea.com
www.pathfinder-ea.com
P Please strive to live sustainably.             
________________________________

From: bldg-sim-bounces at lists.onebuilding.org
[mailto:bldg-sim-bounces at lists.onebuilding.org] On Behalf Of Snarski,
Marty
Sent: Monday, February 08, 2010 2:43 PM
To: bldg-sim at lists.onebuilding.org
Subject: [Bldg-sim] LEED EA P2 requirement clarification
 
There is a debate going on in my office currently, regarding existing
buildings and their envelopes and what is required for EA Prerequisite
2.
 
The LEED 2009-NC Guide says:
 
 "To achieve points using this credit, the proposed design must meet the
following criteria:  
 
-Comply with the mandatory provisions (Sections 5.4, 6.4, 7.4, 8.4, 9.4
and 10.4) in Standard 90.1-2007 (with errata but without addenda).
-Inclusion of all the energy costs within and associated with the
building project.
-Compare against a baseline building that complies with Appendix G......
(we all know about that part).
 
What's got the debate going is that part about Complying with the
mandatory provisions (particularly Section 5.4).  Now, we do a lot of
existing buildings, wherein no insulation is added.  I know that, when
creating the energy model, that when modeling existing buildings, or
portions of existing buildings, where no alterations are being made,
that both the Proposed and Baseline building are modeled with the
as-existing construction.  However, it was brought up that, as the LEED
Guide specifically calls out Section 5.4 (which I've been unable to find
any mention of existing buildings), was intentional, to for any would-be
LEED projects to bring their existing envelope constructions up to
Section 5.4 requirements.  I've looked over the CIRs and didn't find
anything really telling.
 
Does anyone have any insights or suggestions?

Thanks!
 
Martin Snarski   LEED(r) AP 
Mechanical Engineer 
 
NOTICE:
This e-mail transmission is intended only for the use of the individual
or entity named above and may contain information that is confidential,
privileged, and/or exempt from disclosure under applicable law. If you
are not the intended recipient, you are hereby notified that any review,
disclosure, copying, distribution, or other use of any of the
information contained in this transmission is strictly prohibited. If
you have received this transmission in error, please immediately notify
the sender by e-mail at the above address and delete it from your
computer system; you should not copy the message or disclose its
contents to anyone. The content of the message and or attachments may
not reflect the view and opinions of the originating company or any
party it is representing. 
 
NOTICE:
This e-mail transmission is intended only for the use of the individual
or entity named above and may contain information that is confidential,
privileged, and/or exempt from disclosure under applicable law. If you
are not the intended recipient, you are hereby notified that any review,
disclosure, copying, distribution, or other use of any of the
information contained in this transmission is strictly prohibited. If
you have received this transmission in error, please immediately notify
the sender by e-mail at the above address and delete it from your
computer system; you should not copy the message or disclose its
contents to anyone. The content of the message and or attachments may
not reflect the view and opinions of the originating company or any
party it is representing. 
 

_______________________________________________
Bldg-sim mailing list
http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org
To unsubscribe from this mailing list send  a blank message to
BLDG-SIM-UNSUBSCRIBE at ONEBUILDING.ORG
 
-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20100208/bff9821b/attachment-0002.htm>


More information about the Bldg-sim mailing list