[Bldg-sim] SPAM-MED: LEED NC: Existing or New Building

MatthewRLarson at Eaton.com MatthewRLarson at Eaton.com
Mon Jul 11 07:30:15 PDT 2011


We have always used a pro-rated point scale based on floor areas as Kyle
describes for USGBC and it has never been disputed.

 

Thanks,

 

Matthew Larson, LEED AP BD+C
Project Engineer

Energy Solutions Group

E M C Engineers, Inc.
Eaton's Electrical Services & Systems 
143 Union Blvd, Suite 350
Lakewood, CO 80228
tel: +1 303 328-3419
mobile: +1 303 668-2511
fax: +1 303 974-1239

MatthewRLarson at Eaton.com 
www.eaton.com/energysolutions  

 

 

From: bldg-sim-bounces at lists.onebuilding.org
[mailto:bldg-sim-bounces at lists.onebuilding.org] On Behalf Of Kyle
Fridgen
Sent: Friday, July 08, 2011 9:32 AM
To: jtorres-coto at mbo1.com; 'Rob Hudson'
Cc: bldg-sim at lists.onebuilding.org
Subject: Re: [Bldg-sim] SPAM-MED: LEED NC: Existing or New Building

 

The CaGBC allows using a pro-rated point scale based on the relative
floor areas of new and existing.  Not sure if this is the same for
USGBC.

 

Kyle

 

From: bldg-sim-bounces at lists.onebuilding.org
[mailto:bldg-sim-bounces at lists.onebuilding.org] On Behalf Of Jorge
Torres-Coto
Sent: Friday, July 08, 2011 11:00 AM
To: 'Rob Hudson'
Cc: bldg-sim at lists.onebuilding.org
Subject: Re: [Bldg-sim] SPAM-MED: LEED NC: Existing or New Building

 

You use the existing building criteria for % and points in LEED if your
existing portion is greater than  half of the whole project sq.ft.
(existing + addition).  

 

Jorge E. Torres Coto    

4830 Viewridge Ave.

San Diego, CA 92123

p              858.751.0933

f              858.751.0937

c              858.688.6088

 

________________________________

From: Rob Hudson [mailto:rdh4176 at gmail.com] 
Sent: Friday, July 08, 2011 7:52 AM
To: jtorres-coto at mbo1.com
Cc: bldg-sim at lists.onebuilding.org
Subject: Re: SPAM-MED: [Bldg-sim] LEED NC: Existing or New Building

 

Yes, I agree that i should use the existing envelope for the existing
conditions of the existing building and the ASHRAE Min for the new
building.  But it comes down to whether EA Credit 1 follows the new
building % or the existing building %.  it is a 2 point difference that
could effect strategies for saving energy later in the design.

 

Rob

 

On Fri, Jul 8, 2011 at 10:44 AM, Jorge Torres-Coto <
jtorres-coto at mbo1.com> wrote:

The baselines for the existing portion are what is there now.

 

The baselines for the new portion (addition) are ASHRAE definitions.

 

This should help considerably in your overall energy efficiency gains.

 

It all comes down to % new vs. % existing, on how much you can gain.

 

Jorge E. Torres Coto   

4830 Viewridge Ave.

San Diego, CA 92123

p              858.751.0933

f              858.751.0937

c              858.688.6088



________________________________

From: bldg-sim-bounces at lists.onebuilding.org [mailto:
bldg-sim-bounces at lists.onebuilding.org] On Behalf Of Rob Hudson
Sent: Friday, July 08, 2011 7:32 AM
To: bldg-sim at lists.onebuilding.org
Subject: SPAM-MED: [Bldg-sim] LEED NC: Existing or New Building

 

I have a unique situation where the architect is taking an existing
building and majorly renovating it (definition of major per LEED is
HVAC, envelope and interior spaces) and then building an addition which
is roughly the same size of the existing building, give or take a 1000
sqft.

 

Has anyone run into this before or have any insight that might help me
explain which avenue to take to my boss?  I am currently thinking new
building, but if it was existing then that helps me even more.

-- 
Rob Hudson




-- 
Rob Hudson

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20110711/8ea3f15f/attachment-0002.htm>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: image/jpeg
Size: 39998 bytes
Desc: image003.jpg
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20110711/8ea3f15f/attachment-0004.jpeg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: image/jpeg
Size: 1226 bytes
Desc: image004.jpg
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20110711/8ea3f15f/attachment-0005.jpeg>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: image/gif
Size: 14532 bytes
Desc: image005.gif
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20110711/8ea3f15f/attachment-0002.gif>


More information about the Bldg-sim mailing list