[Bldg-sim] Corporate Deduction, comparison of the proposed design with the baseline design by ASHRAE 90.1-2001

Deru, Michael Michael.Deru at nrel.gov
Tue Mar 29 10:46:38 PDT 2011


Yes I will post the release to this list.

Michael

From: jimmy44 at gmail.com [mailto:jimmy44 at gmail.com] On Behalf Of Jim Verzino
Sent: Tuesday, March 29, 2011 11:22 AM
To: Deru, Michael
Cc: Evgenia Gorbachinsky; bldg-sim at lists.onebuilding.org
Subject: Re: [Bldg-sim] Corporate Deduction, comparison of the proposed design with the baseline design by ASHRAE 90.1-2001

Michael,

Will you be posting to the list when this new tool comes out?

Jim V.
On Wed, Mar 23, 2011 at 2:04 PM, Deru, Michael <Michael.Deru at nrel.gov<mailto:Michael.Deru at nrel.gov>> wrote:
Dear Genia,

Please see the DOE web site for more information about the tax deduction and the following NREL report for guidance on calculating the savings.  In addition, DOE and NREL are working on a simplified tool for the tax deduction calculations that will be available in April.

http://www1.eere.energy.gov/buildings/tax_incentives.html
http://www.nrel.gov/docs/fy07osti/40467.pdf

Michael

Michael Deru, Ph.D.
Senior Engineer II
Commercial Buildings Research Group
National Renewable Energy Laboratory
303-384-7503<tel:303-384-7503> (o)
303-725-3528<tel:303-725-3528> (c)
From: bldg-sim-bounces at lists.onebuilding.org<mailto:bldg-sim-bounces at lists.onebuilding.org> [mailto:bldg-sim-bounces at lists.onebuilding.org<mailto:bldg-sim-bounces at lists.onebuilding.org>] On Behalf Of Evgenia Gorbachinsky
Sent: Wednesday, March 23, 2011 11:52 AM
To: bldg-sim at lists.onebuilding.org<mailto:bldg-sim at lists.onebuilding.org>
Subject: [Bldg-sim] Corporate Deduction, comparison of the proposed design with the baseline design by ASHRAE 90.1-2001

Good Afternoon,

Our client would like to get a tax deduction reducing the building's energy and power costs by 50% in comparison to a building meeting requirements set by ASHRAE Standard 90.1-2001.  This standard does not have Appendix G.   Could anybody help to understand,please,  how I can do it.
Do I need to Use section 11 ( Energy cost budget method) of the standard or  I need to use the same systems and plants in both cases, but different lighting density, building envelope and energy rates according to the actual design for the proposed design and Standard 90.1-2001 for the baseline design?


Thanks.

--
With best wishes,
Genia Gorbachinsky

_______________________________________________
Bldg-sim mailing list
http://lists.onebuilding.org/listinfo.cgi/bldg-sim-onebuilding.org
To unsubscribe from this mailing list send  a blank message to BLDG-SIM-UNSUBSCRIBE at ONEBUILDING.ORG<mailto:BLDG-SIM-UNSUBSCRIBE at ONEBUILDING.ORG>

-------------- next part --------------
An HTML attachment was scrubbed...
URL: <http://lists.onebuilding.org/pipermail/bldg-sim-onebuilding.org/attachments/20110329/a56b4212/attachment-0002.htm>


More information about the Bldg-sim mailing list