[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[EnergyPlus_Support] Control Strategy
Dear E+User,
I am looking at the control strategy of the PurchAir example. The Single
Heating and Single Cooling definitions allow heating and cooling only in
the specified periods. The temperature schedules show setpoints for low
and high temperatures. Is this necessary?
As defined by the Zone Control Type Schedule there is no heating in
summer and no cooling in winter. Why are the heating setpoint and
cooling setpoint schedules split into a summer and winter period?
Wouldn?t it be correct the specify a one year period for each schedule?
For the heating setpoint schedule this would mean a temperature range
from 15 to 20 °C from 1.1 to 31.12 and for the cooling setpoint schedule
30 to 23 °C from 1.1 to 31.12.
I would appreciate your reply.
Alexander
__________________________________
DI (FH) Alexander Beisteiner
Forschungs- und Technologietransfer
Pinkafeld GmbH
Steinamangerstrasse 21
7423 Pinkafeld
alexander.beisteiner@xxxxxxxxxxxxxxxxxx
<http://www.fh-pinkafeld.ac.at/> http://www.fh-pinkafeld.ac.at
Tel.: 0043/3357/45370-1324
Fax: 0043/3357/45370/1010
[Non-text portions of this message have been removed]
------------------------ Yahoo! Groups Sponsor ---------------------~-->
Flexible Keyboard is the ideal accessory for PDA users that are on the move.
http://us.click.yahoo.com/dCBVZC/WnCFAA/xGHJAA/dkFolB/TM
---------------------------------------------------------------------~->
To unsubscribe from this group, send an email to:
EnergyPlus_Support-unsubscribe@xxxxxxxxxxxxxxx
The primary EnergyPlus web site is found at:
http://www.energyplus.gov
The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/
Attachments are not allowed -- please post any files to the appropriate folder in the Files are of the Support Web Site.
Your use of Yahoo! Groups is subject to http://docs.yahoo.com/info/terms/