[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[EnergyPlus_Support] Outdoor:Air
- To: EnergyPlus_Support@xxxxxxxxxxxxxxx
- Subject: [EnergyPlus_Support] Outdoor:Air
- From: "roberto.mancin" <roberto.mancin@xxxxxxxxx>
- Date: Fri, 08 May 2009 18:01:10 -0000
- Delivered-to: mailing list EnergyPlus_Support@xxxxxxxxxxxxxxx
- Delivery-date: Fri, 08 May 2009 12:01:41 -0600
- Dkim-signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=yahoogroups.com; s=lima; t=1241805701; bh=XlJVvhTxBKFOyjKxycqY7RfhGNbhrerur6Ir61YW/ao=; h=Received:Received:X-Yahoo-Newman-Id:X-Sender:X-Apparently-To:X-Received:X-Received:X-Received:X-Received:X-Received:X-Received:To:Message-ID:User-Agent:X-Mailer:X-Originating-IP:X-eGroups-Msg-Info:X-Yahoo-Post-IP:From:X-Yahoo-Profile:Sender:MIME-Version:Mailing-List:Delivered-To:List-Id:Precedence:List-Unsubscribe:Date:Subject:Reply-To:X-Yahoo-Newman-Property:Content-Type:Content-Transfer-Encoding; b=DLLOYSlu2DrhbIPCQ0x6jSre6nvbe1iVa30iIMlGgSUZhXMztBfax4+ikt6aCSHjcxANKWFX3+v1scFiKaVdIMkEbYXcK1NqdUq3XiTiDlBeT9B6s0QfiCgPY+xuVSoL
- Domainkey-signature: a=rsa-sha1; q=dns; c=nofws; s=lima; d=yahoogroups.com; b=n6zFTFUCPLpTmbnmEJbfl8lfqPHUgCN1HEso5OW3F/bxWeqA//T3pHn2p9DxqrYhVHzNYhGeHgq4/kD4TS0dT0a9QabW9XU0fvgBlMJJwcUY1fLmHxTF1fdnk6sgsvhm;
- Envelope-to: linda@xxxxxxxxxxxxxx
- List-id: <EnergyPlus_Support.yahoogroups.com>
- List-unsubscribe: <mailto:EnergyPlus_Support-unsubscribe@yahoogroups.com>
- Mailing-list: list EnergyPlus_Support@xxxxxxxxxxxxxxx; contact EnergyPlus_Support-owner@xxxxxxxxxxxxxxx
- Reply-to: EnergyPlus_Support@xxxxxxxxxxxxxxx
- Sender: EnergyPlus_Support@xxxxxxxxxxxxxxx
- User-agent: eGroups-EW/0.82
I work with energy plus and i simulate a building with ceiling mass
activation.
The plant is composed:
LowTempRadianteCostantFlow
FanCoil
Primary Air
I have a problem when i connect the AirLoop to the zone,i want to fix
temperature of the supply air , but the Controller:OutdoorAir not work
correctly , in my plant the Supply Air is 100% outdoor air (exactly 2
ach/h) , only at the start of the air loop plant the system work with 0%
Outdoor air (but now i don't simulate this). The temperature of the
supply air in summer is 16 °C and in winter 18 °C. i create a
SetPoint:Manager:Schedule but they not work correctly.
I am sure that it had not set properly the operation of the
Controller:OutdoorAir,however I do not find the problem. because i have
a flow rate of outdoorAir = 0 [m3/s]
I have tried to move the node controlled by the Controller:OutdoorAir
the correct node( the inlet node of Mixer),to another node...exaclty the
outdoor air node that is the inlet node of the
heat:exhangerAirtoAirLatentSensible and the system work with 100% air,
an the flow rate and the temp is correct for my simulation, but is not
correct for the working of the plant...
Best regards
Roberto Mancin
------------------------------------
The primary EnergyPlus web site is found at:
http://www.energyplus.gov
The group web site is:
http://groups.yahoo.com/group/EnergyPlus_Support/
Attachments are not allowed -- please post any files to the appropriate folder in the Files area of the Support Web Site.
EnergyPlus Documentation is searchable. Open EPlusMainMenu.pdf under the Documentation link and press the "search" button.
Yahoo! Groups Links
<*> To visit your group on the web, go to:
http://groups.yahoo.com/group/EnergyPlus_Support/
<*> Your email settings:
Individual Email | Traditional
<*> To change settings online go to:
http://groups.yahoo.com/group/EnergyPlus_Support/join
(Yahoo! ID required)
<*> To change settings via email:
mailto:EnergyPlus_Support-digest@xxxxxxxxxxxxxxx
mailto:EnergyPlus_Support-fullfeatured@xxxxxxxxxxxxxxx
<*> To unsubscribe from this group, send an email to:
EnergyPlus_Support-unsubscribe@xxxxxxxxxxxxxxx
<*> Your use of Yahoo! Groups is subject to:
http://docs.yahoo.com/info/terms/